Iron Ore Conveyor Design

Aerobelt has been contracted for the new ship loading facility at rio tintos cape lambert projecthe work was carried out in two stages, the phase a and phase b projectserobelt received an order from rio tinto in 2012 to design and supply conveyors for the ship loading sampling system for cape lambert phase ahe second order was received in early 2013 for phase bhase b of the.

Copyright © 2019.Henan Mining Machinery Co., ltd. All rights reserved.Sitemap.xml